The paper discusses, with reference to the power generating gas turbines on the FRIGG TCP-2 platform, the specific and general requirements for offshore gas turbines, and how those sometimes conflicting requirements are met. Furthermore, interesting details of the particular installation on the FRIGG TCP-2 platform are described. The gas turbines on the FRIGG TCP-2 platform are the first ones to be installed in Norwegian water after the Norwegian regulations for “Production and auxiliary systems on production installations, etc.” were officially issued in April 1978. Some of these special regulations and their influence on the gas turbine design are discussed.
Issue Section:
Research Papers
This content is only available via PDF.
Copyright © 1980
by ASME
You do not currently have access to this content.