Increased demands for higher performance, reliability, and versatility from hydraulic turbines and pump/turbines have dictated that manufacturers improve their model testing facilities to thoroughly evaluate individual designs as required by customer specifications. Advances in supporting technology, particularly electronic instrumentation, data acquisition, and motor/generator control, have significantly improved performance data and have reduced testing time to a minimum. This paper discusses a new laboratory design, incorporated by the Hydro-Turbine Division of Allis-Chalmers Corporation for model testing, including the building, the flexible test circuits, the data acquisition system, the power generation system, and the model test stand.
Skip Nav Destination
Article navigation
March 1974
Research Papers
A Modern Laboratory for Hydraulic Turbine and Pump/Turbine Model Performance Testing
G. R. Frey,
G. R. Frey
Product Development, Allis-Chalmers Corp., Hydro-Turbine Division, York, Pa.
Search for other works by this author on:
R. L. Rohrbaugh,
R. L. Rohrbaugh
Product Development, Allis-Chalmers Corp., Hydro-Turbine Division, York, Pa.
Search for other works by this author on:
W. G. Whippen
W. G. Whippen
Product Development, Allis-Chalmers Corp., Hydro-Turbine Division, York, Pa.
Search for other works by this author on:
G. R. Frey
Product Development, Allis-Chalmers Corp., Hydro-Turbine Division, York, Pa.
R. L. Rohrbaugh
Product Development, Allis-Chalmers Corp., Hydro-Turbine Division, York, Pa.
W. G. Whippen
Product Development, Allis-Chalmers Corp., Hydro-Turbine Division, York, Pa.
J. Fluids Eng. Mar 1974, 96(1): 55-61 (7 pages)
Published Online: March 1, 1974
Article history
Received:
July 25, 1973
Online:
October 12, 2010
Citation
Frey, G. R., Rohrbaugh, R. L., and Whippen, W. G. (March 1, 1974). "A Modern Laboratory for Hydraulic Turbine and Pump/Turbine Model Performance Testing." ASME. J. Fluids Eng. March 1974; 96(1): 55–61. https://doi.org/10.1115/1.3447098
Download citation file:
Get Email Alerts
Cited By
Related Articles
Evaluation of Measurement Uncertainties in Performance Testing of Hydraulic Turbines and Pump/Turbines
J. Eng. Power (April,1975)
The Installation, Testing, and Lessons Learned of the TF40B Gas Turbine Test Facility
J. Eng. Gas Turbines Power (April,1996)
ECN Wind Turbine Test Site at Wieringermeer
J. Sol. Energy Eng (November,2003)
Related Proceedings Papers
Related Chapters
Formulation and Dynamic Behavior of Electrical Systems
Introduction to Dynamics and Control in Mechanical Engineering Systems
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Managing Energy Resources from within the Corporate Information Technology System
Industrial Energy Systems