0
RESEARCH PAPERS

Application of Dynamic Programming to Optimize Tool Replacement Schedules for Multi-Tool Operations Involving Distributed Tool Lives

[+] Author and Article Information
H. Bao

Department of Manufacturing, Bradley University, Peoria, Ill. 61614

J. Mech. Des 102(3), 446-451 (Jul 01, 1980) (6 pages) doi:10.1115/1.3254767 History: Received May 21, 1979; Online November 17, 2009

Abstract

There have been a number of models developed to provide the optimum tool replacement schedule for a multi-tool set-up. However, most of these models are quite complex and are geared to yield solutions for a very large set-up involving an indefinite number of parts. In this paper a new tool replacement model aimed at a machining process involving a moderate number of tools (2 to 6) and a discrete number of parts (50 to 100) is developed based on the technique of Dynamic Programming. Tool lives in the set-up are assumed to be distributed.

Copyright © 1980 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In